Figure 10: Top view and indication of the minimum clearances for UPS + other cabinets in row.
Table 4: minimum clearances for UPS + other cabinets in row.
PowerWave 33 Series 3 Cabinets
Back clearance for ventilation
A
(forced air outlet)
Front clearance needed to allow
B
a correct door opening
C
Maximum door opening angle
Top Clearance
D
(Top clearance is only needed if there is no
side clearance)
Battery cabinet requires 100mm clearance for natural ventilation. The UPS does not require any back clearance.
4)
Modifications reserved
Page 15/50
60 / 80 / 100 / 120
0 mm
1000 mm
115°
400 mm
UPS + battery cabinets
in row.
100mm