Clearance Requirements
Figure 4: Clearances Required Around the Chassis
1
Chassis
2
Cable management frames
3
Vertical rack-mount posts and rails
4
Area used for fan tray handles at the rear
of the chassis (allow 2 inches [5 cm])
Cisco Nexus 7706 Hardware Installation Guide
12
9
Chassis width
10
No right side clearance required (no airflow on right
side)
11
Rear service clearance required to replace fan trays
and fabric modules
12
Airflow clearance area required at the rear of the
chassis within the cabinet (if a cabinet is used)