Installation
UPS with Left-Mounted SIAC-B
UPS with Left-Mounted SIAC-B
Figure 4-15. 93PM 150 kW Three-Wire SIAC-B and 93PM 150 kW Four-Wire SIAC-B Conduit Landing Wire Entry Locations
4-22
Eaton 93PM Sidecar Integrated Accessory Cabinet-Bypass (150 kW and 200 kW SIAC-B) Installation and Operation Manual P-164000387—Rev 7
Front
Top Entry Conduit Landing.
(Remove plate to drill or
punch conduit holes.)
Front
Bottom Entry Conduit Landing.
(Remove plate to drill or punch
conduit holes.)
Top
View
UPS with Right-Mounted SIAC-B
Bottom
View
UPS with Right-Mounted SIAC-B
Front
Front
www.eaton.com/powerquality