Eaton 93PM 150 kW SIAC-B Three-Wire Installation And Operation Manual page 65

Sidecar integrated accessory cabinet-bypass
Hide thumbs Also See for 93PM 150 kW SIAC-B Three-Wire:
Table of Contents

Advertisement

13. If an RIB is installed, use hardware from the external wiring terminal hardware kit to connect phase A, B,
and C, and Ground rectifier input power wiring from the utility source to the SIAC-B rectifier input
terminals. See paragraph 3.2.3, Table 3-2 or Table 3-3 and Table 3-8 through Table 3-11 for SIAC-B wiring
and termination requirements.
For a detailed view of the SIAC-B RIB terminals, see Figure 4-21.
14. Proceed to Step 18.
15. Connect phase A, B, and C, Ground, and if required Neutral bypass input power wiring from the utility
source to the SIAC-B maintenance bypass input terminals. See paragraph 3.2.3, Table 3-2, Table 3-3,
Figure 3-4, or Table 3-5, and Table 3-6 or Table 3-7 for SIAC-B wiring and termination requirements.
For SIAC-B terminal phase wiring assignments, see Figure 4-17 or Figure 4-18.
16. Connect phase A, B, and C, Ground, and if required Neutral output power wiring from the SIAC-B output
terminals to the critical load or Integrated Accesssory Cabinet-Distribution (IAC-D). See paragraph 3.2.3,
Table 3-2, Table 3-3, Table 3-4, or Table 3-5, and Table 3-6 or Table 3-7 for SIAC-B wiring and termination
requirements. Refer to the Eaton 93PM Integrated Accessory Cabinet-Distribution (50 kW, 100 kW,
150 kW, and 200 kW IAC-D) Installation and Operation Manual, listed in paragraph 1.7, for conduit and
terminal locations and termination requirements.
For SIAC-B terminal phase wiring assignments, see Figure 4-17 or Figure 4-18.
17 . If an RIB is installed, connect phase A, B, and C, and Ground rectifier input power wiring from the utility
source to the SIAC-B rectifier input terminals. See paragraph 3.2.3, Table 3-2, Table 3-3, Table 3-4, or
Table 3-5, and Table 3-6 or Table 3-7 for SIAC-B wiring and termination requirements.
For a detailed view of the SIAC-B RIB terminals, see Figure 4-21.
18. Reinstall the internal safety shield panel and secure with retained screws.
19. Reinstall the SIAC-B front panel and secure with retained screw.
20. After the SIAC-B is wired, return to the applicable Eaton 93PM UPS installation and operation manual,
listed in paragraph 1.7, to complete the UPS wiring.
Eaton 93PM Sidecar Integrated Accessory Cabinet-Bypass (150 kW and 200 kW SIAC-B) Installation and Operation Manual
P-164000387—Rev 7
www.eaton.com/powerquality
Installation
4-21