Hardware Installations And Upgrades; Before You Begin; Tools And Supplies Needed; System Reference - Intel S7200AP System Integration And Service Manual

Table of Contents

Advertisement

2 Hardware Installations and Upgrades

2.1 Before You Begin

Before working with your server product, closely review the Safety Information at the beginning of this
document.
NOTE: Prior to servicing the compute module or chassis, power down the server, unplug all peripheral
devices and the AC power cords.

2.1.1 Tools and Supplies Needed

Phillips* (cross head) screwdriver (#1 bit and #2 bit)
T30 Torx bit screwdriver
Flat head screwdriver
Needle nosed pliers
Anti-static wrist strap and conductive foam pad (recommended)

2.1.2 System Reference

All references to left, right, front, top, and bottom assume that the reader is facing the front of the chassis
as it would be positioned for normal operation.

2.2 Cable Routing

Each compute module is self-contained and can be hot swapped without any impact to other compute
modules. When you add or remove components from the compute module enclosure, ensure that cables
are routed correctly before plugging in the compute module back into the chassis. Use caution to ensure
that cables or wires are not pinched and that the airflow from the fans is not blocked. Use the figures
below to determine the correct cable routing. Section 2.2 applies to both server boards.
NOTES:

Figure 11. Cable Routing

Orange line: Fan cable connection
Blue line: Server board power cable connection
Red line: Fan control signal cable connection

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

S7200aprHns7200apHns7200apr

Table of Contents