IBM Storwize V5010 Manual page 761

Implementing the ibm storwize v5000 gen2 with ibm spectrum virtualize v8.1
Hide thumbs Also See for Storwize V5010:
Table of Contents

Advertisement

3. Confirm that you want to power off the canister by entering the confirmation code and
clicking OK, as shown in Figure 12-113.
Figure 12-113 Canister power off confirmation window
4. After the node canister is powered off, you can confirm that it is offline in the System
panel, as shown in Figure 12-114.
Figure 12-114 Checking the canister state
To power off a node canister by using the CLI, use the command that is shown in
Example 12-4.
Example 12-4 Powering off a canister by using the CLI
>svctask stopsystem -node 2
Are you sure that you want to continue with the shut down? (y/yes to confirm)
Chapter 12. RAS, monitoring, and troubleshooting
739

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Storwize v5020Storwize v5030

Table of Contents