2. Tighten the screws on the metal sheet for stabilization
3. Connect the Earth line from the UPS (port A ) to EBM (port B)
4. Take off the front panel, and connect the battery terminal (A) from UPS to
EBM terminal (B) shown as below. Users need to remove the small gate
(C) on side of the front panel to allow the outlet wire of the EBM to pass
through the gate and then reassemble front panel.
A
A
C
B
6
B