AccuLine CNQplus 1000RT User Manual page 13

Rack/tower 1000/2000/3000va online ups
Table of Contents

Advertisement

4. Remove the inner battery bracket on the right side.
5. Pull the battery pack out onto a flat area.
6. Install the new battery pack into the UPS.
7. Screw the battery bracket back on its place and reconnect the battery cable
A and B
8. Re-install the front panel on the UPS.
1.3.5 Testing New Batteries
Before testing the Batteries, please check that:
The batteries are fully charged.
The UPS is in Normal mode with no active alarms.
The load on the UPS output is not variable.
12