AccuLine CNQplus 1000RT User Manual page 6

Rack/tower 1000/2000/3000va online ups
Table of Contents

Advertisement

Rack-mount setup
CNQplus RT series can be installed in 19 inches racks. Both the UPS and each
external battery enclosure need 2U of rack space.
Use the following procedure to install UPS in a rack.
1. Align the mounting ears with screw holes on the side of the UPS, and tighten
the screws.
2. Assemble the rack rails onto the rack-mounting.
3. Slide in the UPS into the rack rail and lock it inside the Rack-mounting.
4. Tighten the screws, and then the load can be connected.
1.1.4 EBM Installation (Optional)
UPS Acculine CNQplus series include external battery port that allows users
to connect multiple EBMs in order to provide additional backup time. Follow
the below procedure to install one or multiple EBM.
Connecting one EBM in Tower form:
1. Slide down both the UPS and the EBM vertically and place two UPS stands
with the extension parts at the end of the tower.