AccuLine CNQplus 1000RT User Manual page 24

Rack/tower 1000/2000/3000va online ups
Table of Contents

Advertisement

is ground protection)
(6) Make sure the wires are fastened and install the UPS front panel back to
its place.
(7) Connect the loads to the UPS. Then, connect the UPS to the utility power
supply and the batteries will be charged.
Caution:
A DC breaker should be connected between the UPS and the external
batteries.
Caution:
The output sockets of the UPS may still be electrically live even if the system
has been disconnected from the power supply or the Bypass
position.
23

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents