AccuLine CNQplus 1000RT User Manual page 5

Rack/tower 1000/2000/3000va online ups
Table of Contents

Advertisement

1.1.2 Unpacking the Cabinet
To unpack the system:
1. Open the outer carton and remove the accessories packaged with the
cabinet.
2. Carefully lift the cabinet out of the outer carton and set it on a flat, stable
surface.
3. Discard or recycle the packaging in a responsible manner, or store it for
future use.
1.1.3 UPS Setup
CNQplus RT series are designed for both tower and rack mount set up.
They can be installed into a 19 inches rack. Please follow the instructions for
Tower Setup and Rack-Mount Setup.
Tower setup
CNQplus RT series can be placed horizontally and vertically. As a tower
configuration, the appropriate UPS stands are provided in the package to
stabilize the UPS when it is positioned vertically. The UPS stands must be
attached to the bottom of the tower. Use the following procedure to install UPS
in UPS stands.
1. Slide down the UPS vertically and put two UPS stands at the end of the tower.
2. Place down the UPS into the two stands carefully.
3. Pull out the LCD box and rotate it in a clockwise direction to 90 degree and
then push it back in the front panel
4

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents