1)
PV
generation
consumption (ΔP < 100W), the
POWER BOX will stay in Standby
state
3)
When the PowerCube 2.0 is full(or
already
at
Power),
excess
exported to the grid.
5)
If PV generation + PowerCube 2.0 <
LOAD consumption, the POWER
BOX will import power from the grid.
2) Set Time-of-use Mode
Select "2.Set Time-of-use Mode", and then press "OK" to enter Set Time-of-use
mode interface. End user can set an off-peak time period (evening charging
time period) and target SOC (SOC to terminate evening charging). The
=
LOAD
the
Max.
Charge
power
will
be
2)
PV
generation
consumption, the surplus power will
be stored in the PowerCube 2.0
firstly.
4)
PV
generation
consumption,
PowerCube 2.0 to supply power to
load firstly,
6)
Press "DOWN" button to view
current information of the POWER
BOX in the main interface, as
below.
>
LOAD
<
LOAD
discharge
the
Need help?
Do you have a question about the Power Box and is the answer not in the manual?