Representation Of Signals In Time Domain - ABB PSE 18 Installation And Commissioning Manual

Hide thumbs Also See for PSE 18:
Table of Contents

Advertisement

Control supply voltage
Operational voltage on the
line side
Control circuit - Start input
Control circuit - Stop input
Operational voltage on the
motor side
Signal output relay - Run signal
Signal output relay - TOR signal
Signal output relay
- Tripping event NC signal
Signal output relay
- Tripping event NO signal
Status signal - Ready LED
Status signal - Run LED
Status signal - Fault LED
76
Chapter 7
Softstarters Type PSE18...PSE370 Installation and commissioning manual 1SFC132057M0201

7.8 Representation of signals in time domain

Timing diagram for the basic functions of the softstarter, with a representation of a
set of signals in the time domain is found in table 7.3.
Table 7.3: Timing diagram
1
2
3 4
5 6 7
8
9
10
11
12
13 14
1
2
3 4
5 6 7
8
9
10
11
12
13 14
1
2
3 4
5 6 7
8
9
10
11
12
13 14
1
2
3
4
5 6 7
8
9
10
11
12
13 14
1
2
3 4
5
6 7
8
9
10
11
12
13 14
1
2
3 4
5
6
7
8
9
10
11
12
13 14
1
2
3 4
5 6
7
8
9
10
11
12
13 14
t

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents