Mira elite 2 Installation, Operation, Maintenance Manual page 13

Pumped electric shower
Table of Contents

Advertisement

1.15. When installed in very hard water
areas (above 200 ppm temporary
hardness) your installer may advise
the installation of a water treatment
device, to reduce the effects of
limescale formation. Mira Elite 2
malfunction due to excessive
limescale formation is not covered
by the manufacturer's guarantee.
Your local water company will be
able to advise the hardness of water
in your area.
1.16. Avoid layouts where the hose will be sharply kinked. This may reduce the life of
the hose.
1.17. Long pipe runs and excessive use of 90° elbows will significantly reduce the
available head to supply the Elite 2. The pipework table should be completed to
ensure that adequate head is available for any given application.
Plumbing Schematic Diagram
(to be used with pipework table overleaf)
A
X
Hose Retaining
Ring
25 mm Minimum
Spill-over
Level
Figure 1
B
Power
Low Flow
Medium
Low
High
Temperature
Start Stop
13

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents