Mira elite 2 Installation, Operation, Maintenance Manual page 18

Pumped electric shower
Table of Contents

Advertisement

1.9. An installation template is supplied on the internal packaging to help you
install the Mira Elite 2. Put the installation template on the wall and mark
through the positions of the fixing holes. Make sure that sufficient electrical
supply cable is available for connection to the terminal block.
1.10. Drill and plug the top two fixing holes. Secure the Mira Elite 2 to the wall
with the screws provided. Drill the bottom fixing hole with the product in
place. Alternative fixings (not supplied) may be necessary for some wall
structures. Avoid drilling into any supply cable/pipe.
Note! Rubber feet are supplied with the Mira Elite 2. The rubber feet
locate in recesses in the rear of the case and can be fitted if required.
1.11. Install the CISTERN FED cold water supply pipe.
1.12. Make the connection to the CISTERN FED cold water supply pipe.
1.13. Bring the electrical supply cable into the case through one of the cable
entry points.
1.14. Strip back sufficient of the outer cable insulation to enable routing to
terminal block.
1.15. Fit an earth sleeve to the earth conductor. Connect the conductors firmly
into the terminal block. Make sure that the bare cores of each conductor are
securely trapped within each conductor clamp.
L = Red wire
N = Black wire
E = Yellow/Green sleeved wire.
1.16. Re-tighten the terminal block screws.
1.17. If necessary, fit an earth bonding clamp to the copper supply pipe and
ensure bonding complies with the relevant regulations in force at the time of
installation.
1.18 Ensure the drip shield and dust shield are correctly installed. DO NOT
operate the shower if the dust and drip shields are not fitted.
1.19. Refit the service tunnel and the cover and tighten the four cover retaining
screws.
1.20. Fit the shower fittings. Refer to seperate instructions.
18

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents