Mounting And Debugging; Mounting; Vto6210B And Vto6210Bw - Dahua Villa VTO Quick Start Manual

Version 3.1
Hide thumbs Also See for Villa VTO:
Table of Contents

Advertisement

2.1

Mounting

Don't install VTO in bad environment, such as condensation, high temperature, stained,
dusty, chemically corrosive, direct sunshine or completely unsheltered environment.
Engineering mounting and debugging shall be done by professional teams. Please don't
dismantle or repair arbitrarily in case of device failure.

2.1.1 VTO6210B and VTO6210BW

Before installing the bracket or flush mount box, cables in the wall shall be led through the
bracket or flush mount box.
Mounting method of VTO6210B and VTO6210BW is the same. Take "VTO6210B" for example.
Step 1 Fix the mounting bracket onto the wall.
1.
Fix the bracket onto 86 box with M4 screws. Screw holes are located in Points 3 as
shown in the figure.
2.
To strengthen product firmness, tighten it with ST3.0 screws in Points 4 as shown
in the figure.
Step 2 Connect cables. Please refer to "1.1.2 Rear Panel" for details.
Step 3 Put the bare device onto the mounting bracket; fit the upper edge first and then push
the lower edge gently.
Step 4 Fix the whole device onto the bracket with M3 screws.
2

Mounting and Debugging

11

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Vto6210bVto6100cVto2000aVto2000a-2Vto6210bwVto6000cm ... Show all

Table of Contents