Supporting Elevating Assembly; Removal - Snorkel TM12 Service Manual

Hide thumbs Also See for TM12:
Table of Contents

Advertisement

Section 3 - Service & Repair
3-1 S
UPPORTING
W A R N I N G
!
Never perform service on the work platform in the elevating assembly area while platform is elevated
without first blocking the elevating assembly.
DO NOT stand in elevating assembly area while deploying or storing brace.
I
N S T A L L A T I O N
1. Park the Work Platform on firm level ground.
2. Verify Chassis Emergency Stop Switch is ON.
3. Switch the Key switch to chassis. control.
4. Push and hold the enable toggle switch and push the Chassis
lift/lower toggle switch to the up position to elevate the platform
approximately 1.2m (4 feet).
5. Place a wood block, 5cm x 10cm x 46cm (2 in. x 4 in. x 18 in.) long
between the #2 Mast and Chassis just behind the Mast Assembly.
6. Push and hold the enable toggle switch and push the Chassis
lift/lower toggle switch to the down position and gradually lower
the platform until the second mast section is supported by the block.
R
E M O V A L
1. Push and hold the enable toggle switch and push the Chassis
Lift/Lower toggle Switch to UP to gradually raise Platform until the
wood block can be removed.
2. Remove block.
3. Push and hold the enable toggle switch and push the Chassis Lift/Lower toggle Switch to
the DOWN position and completely lower the Platform
E
A
LEVATING
!
SSEMBLY

Supporting Elevating Assembly

Figure 3-1: Supporting Elevating Assembly
Number 2 Mast
Wood Block
Page 3-3

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents