Supporting Elevating Assembly; Installation; Removal; Preventative Maintenance - Snorkel TM12 Service And Parts Manual

Hide thumbs Also See for TM12:
Table of Contents

Advertisement

Section 3 - Service & Repair
3-1 S
UPPORTING
W A R N I N G
!
Never perform service on the work platform in the elevating assembly area while platform is elevated
without first blocking the elevating assembly.
DO NOT stand in elevating assembly area while deploying or storing brace.
I
N S T A L L A T I O N
1. Park the Work Platform on firm level ground.
2. Verify Platform Emergency Stop Switch is ON.
3. Verify Platform Key Switch is ON.
4. Press the Enable button and push Chassis Lift/Lower toggle Switch
to UP to elevate Platform approximately 1.2m (4 feet).
5. Place a wood block, 5cm x 10cm x 46cm (2 in. x 4 in. x 18 in.) long
between the #2 Mast and Chassis just behind the Mast Assembly.
6. Press the Enable button and push Chassis Lift/Lower toggle Switch
to DOWN position and gradually lower Platform until the #2 Mast is
supported by the block.
R
E M O V A L
1. Press the Enable button and push Chassis Lift/Lower toggle Switch
to UP to gradually raise Platform until wood block can be removed.
2. Remove block.
3. Press the Enable button and push Chassis Lift/Lower toggle Switch to DOWN position and completely
lower Platform
4.
3-2 P
REVENTATIVE
The complete inspection consists of periodic visual and operational checks, along with periodic minor
adjustments to assure proper performance. Daily inspection will prevent abnormal wear and prolong the
life of all systems. The inspection and maintenance schedule is to be performed at regular intervals.
Inspection and maintenance shall be performed by personnel who are trained and familiar with mechanical
and electrical procedures.
W A R N I N G
!
Before performing preventative maintenance, familiarize yourself with the operation of the machine.
Always block the elevating assembly whenever it is necessary to enter the scissor assembly to perform
maintenance while the platform is elevated.
The preventative maintenance table has been designed for machine service and maintenance repair.
Please photocopy the following page and use the table as a checklist when inspecting the machine for
service.
E
A
LEVATING
!
M
AINTENANCE
!
SSEMBLY

Figure 3-1: Supporting Elevating Assembly

Supporting Elevating Assembly

Number 2 Mast
Wood Block
Page 3-3

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents