SpectraLink IP-DECT 200 Installation Manual page 19

Hide thumbs Also See for IP-DECT 200:
Table of Contents

Advertisement

Spectralink IP-DECT Server 200 Deployment and Installation Guide
Installing Multiple Spectralink IP-DECT Server 200s in
Large Areas (2)
Large areas defined as: radius larger than 30 meters/100 feet; 30 meters/100-feet cells overlap.
The image below shows overlapping cells supporting up to 5 base units (total).
Users can talk within their own 30 meters/100-feet radius cells. Users from both cells can talk in the
common (overlapping) area. Cells on adjacent floors can also overlap.
1. Follow the previous instructions for installing multiple base units and select the optimal loc-
ations for up to 5 base units.
2. Where the 30 meters/100 feet radius cells overlap, then the maximum number of base units
installed in the area that overlaps must be 5 or fewer to avoid any interference. This includes
where adjacent floors may overlap.
14212650-IG, Edition 1.0
April 2018, Original document
19

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the IP-DECT 200 and is the answer not in the manual?

Questions and answers

Subscribe to Our Youtube Channel

This manual is also suitable for:

K0057234 5600723 45601

Table of Contents