Startup And Functional Checks; Startup; Functional Checks Of Operating Parameters; Figure 2-15. Concentration Graph And Meter Graph - Teledyne T640 User Manual

Pm mass monitor
Hide thumbs Also See for T640:
Table of Contents

Advertisement

2.9.

STARTUP AND FUNCTIONAL CHECKS

2.9.1.

STARTUP

2.9.1.1.

FUNCTIONAL CHECKS OF OPERATING PARAMETERS

08354A DCN7303

Figure 2-15. Concentration Graph and Meter Graph

Upon initial startup, allow the instrument to run for at least 10 minutes to reach
stable operating conditions.
After warm-up, navigate to the Dashboard screen to verify that the Monitor is
functioning within allowable operating parameters (the Appendix shows the list
of test functions and their expected values; the enclosed Final Test and
Validation Data sheet lists these values as they appeared before the instrument
left the factory). If not all test functions and values are displayed here, touch the
configuration icon to insert additional functions into the Dashboard (Section 3.1.2
has more details).
These functions can also be used as diagnostic tools for troubleshooting a
performance problem.
Teledyne API T640 PM Mass Monitor
28

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents