Ventilation Clearance; Table 2-1. Ventilation Clearance - Teledyne T640 User Manual

Pm mass monitor
Hide thumbs Also See for T640:
Table of Contents

Advertisement

2.1.1.

VENTILATION CLEARANCE

08354A DCN7303
a. Remove the cover screws located on the sides of the instrument.
b. Slide the cover backward until it clears the instrument's front bezel.
c. Lift the cover straight up.
2. Inspect the interior to ensure all circuit boards and other components are
intact and securely seated.
3. Check the connectors of the various internal wiring harnesses and pneumatic
hoses to ensure they are firmly and securely seated.
4. Verify that all of the optional hardware ordered with the unit has been
installed. These are listed on the paperwork accompanying the instrument.
Whether the Monitor is set up on a bench or installed in an instrument rack, be
sure to leave sufficient ventilation clearance.

Table 2-1. Ventilation Clearance

AREA
Back of the instrument
Sides of the instrument
Above and below the instrument
Teledyne API Model T640 PM Mass Monitor
MINIMUM REQUIRED CLEARANCE
10 cm / 4 in
2.5 cm / 1 in
2.5 cm / 1 in
13

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents