Panasonic KW9M User Manual page 70

Eco-power meter advanced type
Hide thumbs Also See for KW9M:
Table of Contents

Advertisement

<Present demand (PV)>
It shows demand value from the time when demand span starts to present time.
[Calculation]
CT input (calculated by Eco-POWER METER)
Present
demand (kW)
Pulse input (integral pulse input from a power meter)
Present
demand (kW)
<Estimated demand (EV)>
It shows the estimated demand value at the end of demand span according to the using power from the
time when demand span starts to present time.
[Calculation] (addition)
Estimated
demand(kW)
[Calculation] (average)
Estimated
demand(kW)
<Power demand threshold (SV)> It shows the threshold for demand alarm output.
<Ratio of estimated demand (SET.R)> Ratio of estimated demand to power demand alarm threshold.
<Alarm output>
When present demand or estimated demand is satisfied the setting conditions, it output alarm and it
indicates alarm.
Phone: 800.894.0412 - Fax: 888.723.4773 - Web: www.clrwtr.com - Email: info@clrwtr.com
Integral electric power
=
until present from the start
Integral electric power
=
until present from the start
(Integral electric power
=
until present from the start x pulse rate)
(Integral electric power
=
until present from the start x pulse rate)
Present
=
demand
Present demand
=
Pass time
×
30 (min.) Demand span
× 2
×
× 2
Power change amount
for⊿t minutes (⊿P)
Sampling cycle ⊿t (minute)
Remaining time
×
(minute)
63
60 (min.
60 (min.
30 (min.) Demand span
Remaining
time
×
(minute)

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Akw92112

Table of Contents