Commissioning; General Requirements - Siemens FUS1010 Operating Instructions Manual

Sitrans standard liquid ultrasonic flow meter
Hide thumbs Also See for FUS1010:
Table of Contents

Advertisement

Commissioning

6.1

General requirements

Before commissioning it must be checked that:
● The device has been installed and connected in accordance with the guidelines provided
● Device installed in hazardous location meets the requirements described in "Installation in
6.2
Commissioning
Note
Refer to [Programming the Transmitter] (Page 49) if needed.
1. Scroll down to [Install Sensor] and press <Right Arrow>.
FUS1010 IP65 NEMA 4X & IP66 NEMA 7
Operating Instructions, 01/2013, A5E02951520-AC
in chapter 4 "Installing/mounting (Page 33)" and chapter 5 "Connecting (Page 37)"
hazardous location (Page 14)"
6
83