3.1.2
Installation of the interface board
5
4
3
Figure 2:
Installation of the interface board
•
Insert the interface board (4) with the socket connector (2) and press down until the
latches (3) engage
•
Screw in fixing bolt (5) and tighten with 2.0...2.2 Nm
•
Put the cover (6) until it engages top down on the guide rails (1)
•
Fill out the return form from chapter 4 and send it back
6
2
3
Installation of the encoder interface housing D and E
Mechanical installation
1 Guide rail
2 Socket connector
3 Latch
4 Interface board
5 fixing bolt
6 Cover
1
GB -11