Kasco 8400JF Owner's Instructions Manual page 11

J series decorative aerators
Table of Contents

Advertisement

Light kit connections:
Black connects to Terminal
#6
White connects to Terminal #7
Green connects to Terminal
G
STEP FOUR:
Test the GFCB with the test button now and every
30 days.
If lights are installed, they can now be installed per
Instructions included with the lights.
Once completed, power can be restored to the panel.
Record the following data while the Aerator is
operating in the water under load:
Voltage:
L1-L2 ________
L1-N _________
L2-N _________
Amperage:
L1 __________
L2 __________
Date installed _____/_____/_____
Any unauthorized modifications to this control panel
will void the UL listing and the Kasco warranty.
11

Advertisement

Table of Contents
loading

This manual is also suitable for:

3.1jf5.1jf

Table of Contents