Brief Operating Instructions - Lauda Integral XT 150 Operating Instructions Manual

Integral xt series. process thermostats / high-temperature thermostats
Table of Contents

Advertisement

2

Brief operating instructions

1. Set up the device or complete the configuration as required (þ 6.1).
The device should never be tilted or stood upside down!
Note the connection of the hose joints (þ 6.2).
2. Pay attention to pressure sensitive loads (e.g. glass apparatus) with a maximum permissi-
ble operating pressure (þ 7.9.4).
3. Only operate the Integral XT when flow through the external load is possible.
4. Open any shut-off valves in the external loads.
5. Compare the details on the rating label with the mains voltage.
Three-phase device: Ensure a clockwise phase sequence.
Only XT 1850 W Order No. LWP 732 and XT 1590 W Order No. LWP 742:
Check the switch position [400 V; 3/PE; 50 Hz or 440-480 V; 3/PE; 60 Hz] for presence of
mains voltage and frequency. An incorrect setting does not result in any damage, but an
error message occurs
correctly set switch to the correct voltage and frequency values. The switch is fitted on the
back of the unit at the top left, behind the cover panel (þ 2.3).
6. Only connect device to a socket having a safety earth conductor.
7. Switch on the device by the main fuse-switch on the front panel ("ON =
8. In the display you see either the current out-
flow temperature , e.g.:
or if the device has not yet been filled:
10
These brief instructions shall give you the possibility to operate the unit quickly.
For safe operation of the unit, it is absolutely necessary to read carefully all the instruc-
tions and safety notes!
Error 367
Bench-top device
Brief operating instructions
(þ 9.4). With the unit switched off, set the in-
Floor-standing device
Act. val. outflow temp.
°C
02%32
Fill device
°C
FiLL
Integral XT
l
").
YAWE0028 / 24/06/2016

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents