Appendix; Blow Off Installation Instruction Sheet - Conair TrueBlend TB45-4 User Manual

Gravimetric blender
Table of Contents

Advertisement

TrueBlend™

13.0 Appendix

13.1 Blow off installation instruction sheet

1
2
3
4
Fig. 1:
5
6
7
8
Edition: February 2007
Mark location of hole that will need to be drilled and tapped (see page two
for your particular blender size).
Remove the level sensor (noting location of adjustment and sensor face),
mixing chamber front plate, mixing chamber, mixer, and any wiring that is
in the way of drilling the hole.
Drill pilot hole at indicated location.
Drill 11/32" hole (de-burr hole) and tap 1/8" NPT. Do not run tap fully
through the chassis. Clean all shavings and fines from the chassis.
Install item 8 into tapped hole and tighten.
Slide item 1 into item 8 though the mixing chamber (this may be necessary
because of welded end). Do not tighten yet.
Install item 7 onto end of item 1 and tighten.
Remove air inlet to regulator and install item 2, 3, 4, and 5 and tighten (use
thread tape where needed). If the compressed air quality is poor and has
contaminates in it the fitting should be installed on the outlet side of the
regulator. Picture shows recommended placement of the items but they
can be installed as necessary.
Appendix
[1]
[2]
[3]
[4]
[5]
[6]
[7]
[8]
143