Procedure From Installation To Operation - Omron BN50T Instruction Manual

Table of Contents

Advertisement

Procedure from installation to operation

The procedure from installation to operation is shown below.
BN50T/BN75T/BN100T/BN150T/BN220T/BN300T
Procedure from installation to operation
Read "Safety precautions"
Page 7
Remove the product from the
package and check the contents
1. Preparation
Perform installation and
connection
2. Installation and connection
Are you using either of the
following functions?
- UPS monitoring software
- Contact signal
- SNMP/Web card
No
Check the operation
3. Check and start operation
(Charge the battery *)
Operate
3. Check and start operation
Perform maintenance
and inspection
4. Maintenance and Inspection
Replace the battery
4.2 Replacing the battery
Start
Installation/connection
5.To perform shutdown processing
of the devices such as your PC
when a power failure occurs
Yes
6. Using contact signal functions
7. Using an SNMP/Web card
Preparation for operation
* The UPS has been charged prior to shipment.
However, if it is left for a long period of time, it
may have self-discharged.
We recommend charging the UPS before using it.
No
Perform maintenance
The battery must
be replaced
Yes
Operate
and inspection
3

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Bn75tBn300tBn100tBn150tBn220t

Table of Contents