Preparation For Operation - Omron POWLI Instruction Manual

Table of Contents

Advertisement

Procedure from installation to operation
Read "Safety precautions"
Page iii
Remove the product from the
package and check the contents
Page 1
Perform installation and
connection Page 6
Are you
using UPS monitoring
software or contact
signal?
No
Check the operation and
displays
Charge the battery
Page 24
Measure the backup time
Page 24
Charge the battery again
Page 24
* Preparation for operation is
complete.
Operate Page 25
Perform maintenance
and inspection Page 44
Replace the battery
Page 46
Yes
Read "Using the UPS
monitoring software and
contact signal" Page 55
Page 22
Start
Installation/connection

Preparation for operation

No
Deteriorated
battery?
Yes
1002
3002
BU
SWG / BU
Maintenance/
inspection
SWG
i

Advertisement

Table of Contents
loading

This manual is also suitable for:

Bu3002swgBu1002swg

Table of Contents