Procedure from installation to operation
Procedure from installation to operation
The procedure from installation to operation is shown below.
Read "Safety Precautions"
Page 8
Remove the product from the
package and check the contents
2. Preparation
Perform installation and connection
3. Installation and connection
Are you using either of the
following functions?
- Automatic shutdown software
- I/O signal functions
Check the operation
4. Check and start operation
Charge the battery*
Operate
4. Check and start operation
Perform maintenance and inspection
5. Maintenance and Inspection
Replace the battery
5.2 Replacing the battery
2
No
* The battery in the UPS has not been charged
prior to shipment. Charge the battery when you
use the UPS for the first time.
Start
Installation/connection
Yes
6. To perform shutdown processing of the
devices when a power failure occurs
7. Using the I/O signal functions
Preparation for operation
No
Perform maintenance
The battery must
be replaced
Yes
Operate
and inspection
S8BA-24D24D□□□LF