Operation - Omron S8T-DCBU-01 Manual

Dc backup block
Hide thumbs Also See for S8T-DCBU-01:
Table of Contents

Advertisement

Bus Line Connector
S8T-BUS03
(1)
Selector
(2)
Ground Terminal
(3)
Parallel Operation Signal Terminal
(4)
DC Output Terminal (+)
DC Output Terminal ( − )
(5)

Operation

Backup Function
(Backup status indication, Operation mode output)
S8T-DCBU-01 detects output voltage drop of S8TS-06024@ to
switch to backup operation.
Indicator
Operation mode
output relay
Backup
1
COM
2
Normal
3
LED lit
Relay (OPN MODE)
(BACKUP: Red)
(1)-(2): ON
Backup operation continues for about 7 seconds even after the out-
put voltage of S8TS-06024@ is restored.
Backup
status
Power failure
Continuous
backup
Failure
During
operation
of one
operation of
unit of
one unit of
S8TS-
S8TS-06024@
06024@
During
Repetition of
operation of
switching
multiple units
between
of S8TS-
Normal
06024@
operation and
Upon activation of
Backup
overcurrent protection
operation at
function of S8TS-
an interval of
06024@
about 7
seconds
1
2
3
4
5
LED
Relay
(BACKUP: Red)
(OPN MODE)
Lit
Backup
(1)-(2): ON
Blink at an
Repetition of
interval of
switching
about 7
between
seconds
Normal
((3)-(2): ON)
and BACK
UP
((1)-(2): ON)
Battery Holder
S82Y-TS01
5
1
(1)
Battery Tray
(2)
Fuse
(3)
Terminal Block
(4)
Switch
(5)
Battery A (Order separately)
(6)
Battery B (Order separately)
(7)
Protection Cover
Note: 1. If this state occurs, a probable cause is an S8TS-06024@
overload or it is out of order. Immediately eliminate the
cause of the trouble.
2. If switching between backup operation and Normal opera-
tion is repeated, the output voltage changes accordingly.
3. The contact capacity of the relay is 24 VDC 0.1A.
4. Upon a steep load fluctuation, the output voltage of S8TS-
06024@ drops to switch to backup operation.
5. The maximum inrush current specified below (on assump-
tion with a 56000 µ F capacitive load) flows when backup op-
eration starts.
45
0
25 ms
Time
Charging Circuit
Charging Time (Reference Values)
Battery used
LC-@122R2@@
24 to 48 hours
LC-@123R4@@
Note: The battery takes the time specified above to be charged.
If power failure occurs at time shorter than the necessary
charging time, backup operation may not continue for the nec-
essary time.
Output Voltage Adjustment for
S8TS-06024@
The DC backup block detects output voltage drop of connected
S8TS-06024@ to switch to backup operation.
Do not set the output voltage of S8TS-06024@ to lower than the fac-
tory shipment setting because, even though the output voltage of
S8TS-06024@ is adjustable with Output voltage adjustor. Otherwise,
it may operate in the backup operation mode.
DC Backup Block for S8TS
6
7
3
2
4
Battery charge status: Fully charged
Ambient temperature: 40˚C
Input capacitor of connected equipment: 56,000 µF
Load power: 192 W
100% charged
80% charged
5 hours
8 hours
S8T-DCBU-01
5

Advertisement

Table of Contents
loading

Table of Contents