Procedure For Commissioning The Et 200Mp Distributed I/O System; Commissioning The Et 200Mp For Profinet Io - Siemens Simatic S7-1500/ET 200MP System Manual

Automation system
Hide thumbs Also See for Simatic S7-1500/ET 200MP:
Table of Contents

Advertisement

Commissioning

11.4 Procedure for commissioning the ET 200MP distributed I/O system

11.4
Procedure for commissioning the ET 200MP distributed I/O system
11.4.1

Commissioning the ET 200MP for PROFINET IO

Introduction
The commissioning of your automation system depends on the plant configuration.
The following procedure describes the commissioning of the distributed I/O system on an IO
controller.
Commissioning procedure
To commission the ET 200MP as an IO device for PROFINET IO, we recommend the
following procedure:
Table 11- 2
Step
1
2
4
5
6
7
8
9
10
230
Procedure for commissioning the ET 200MP as an IO device for PROFINET IO
Procedure
Install ET 200MP
Connect ET 200MP
Supply voltages
PROFINET IO
Sensors and actuators
Configure IO controller
Switch on supply voltages for the IO controller
Switch on supply voltages for IO devices
Download configuration to the IO controller
Switch IO controller to RUN mode
Check LEDs
Test inputs and outputs
See...
Section Installation
(Page 108)
Section Wiring (Page 122)
CPU manual or documenta-
tion of the IO controller
CPU manual or documenta-
tion of the IO controller
Interface module
(http://support.automation.sie
mens.com/WW/view/en/6729
5970/133300) manual
STEP 7 online help
CPU manual or documenta-
tion of the IO controller
Interface module
(http://support.automation.sie
mens.com/WW/view/en/6729
5970/133300) manual
The following functions are
helpful: Monitoring and modi-
fying tags, testing with pro-
gram status, forcing,
modifying the outputs. See
section Test functions and
fault resolution (Page 302)
Automation system
System Manual, 12/2017, A5E03461182-AE

Advertisement

Table of Contents
loading

Table of Contents