Model 3585A
4·5. OPERATIONAL VERIFICATION TESTS OVERVIEW
The Operational Verification Tests are done manually for the 3585A and are designed to be
run with a minimum amount of equipment. A comparison of the required test equipment is
presented in Table 4-1 . These tests give the user a good indication of the overal condition of
the 3585A. Using this method of testing a
its specifications is obtained. The Operational Verification tests take about 3 hours to run
(as compared to 2 1 14 hours for a complete semi-automatic characterization) .
4·&. SEMI·AUTOMATIC PERFORMANCE TESTS OVERVIEW
Due to the vast number of features incorporated in the 3585A, Semi-Automatic Perfor
mance testing is a highly desirable alternative to the Operational Verification tests. The func
tion of Semi-Automatic Performance testing is to free the operator from the time consuming
data gathering and documentation normally associated with Performance Tests. Semi
Automatic Performance Tests will check all of the specifications and do so in a much more
detailed manner than the Operational Verification Tests. The Semi-Automatic Performance
Tests give you a confidence level of 99% and take approximately 2 1 14 hours to complete.
The Semi-Automatic Performance Tests and associated instructions are contained on the
cassette tape (Part Number 03585-100(1) included with the 3585A. In order to run the Per
formance Tests automatically, the program contained on the cassette tape is loaded into the
-hp- 9825A calculator memory and run. Once the program is started, instructions for runn
ing the Performance Tests are printed by the calculator or displayed on the 3585A CRT.
After the instructions have been completed, the calculator will procede to execute the pre
sent test and document the data. This process gives the operator a neatly typed summary of
the performance of the 3585A in a minimum amount of time.
90070
level of confidence that the 3585A meets all
Performance Tests
4-3