Installation; Required Tools/Equipment; Installation Steps; Step 1: Position The System - Thermo Scientific Versette Brief User Manual

Table of Contents

Advertisement

Installation

Required tools/equipment

Precision level (bull's eye level or similar level recommended)
4 mm, 3 mm, 2.5 mm, and 2 mm hex
Phillips screwdrivers

Installation steps

Refer to the Versette User Manual for installation details.

Step 1: Position the system

1.
Move the packed instrument to its site of operation.
2.
To prevent condensation, the instrument should be left in its protective wrapping until the ambient
temperature has been reached.
3.
Unpack the Versette system and accessories carefully to prevent damage. Leave at least one
foam end piece in place during installation to prevent the system stages from sliding back and
forth during the installation process.
Warning! The base system (without pipetting module, pipetting heads, and stage assembly)
weighs approximately 36 kg [80 lbs.] and should be lifted with care. Remove the instrument from
the package using a two-person lift.
4.
Position the system on a stable, vibration-free work platform, away from magnetic fields. Refer to
the "Site requirements" in the Versette User Manual for details. Use a precision level to ensure
the installation work surface is level.
5.
Remove the transport lock from the stage.
wrenches
(ogonal)
Leave the foam in place to prevent sliding of the stages
during installation.
Remove transport lock
6

Advertisement

Table of Contents
loading

Table of Contents