Installing The Tower Server - Fujitsu PRIMERGY 400 Operating Manual

Table of Contents

Advertisement

Installation

Installing the tower server

Do not expose the server to extreme environmental conditions (see chapter
!
data"). Protect it from dust, humidity and heat.
There must be a clearance of at least 200 mm in front of and behind the server to ensure
adequate ventilation. Do not cover the ventilation areas of the monitor and the server.
Prepare the keyboard
Ê
Plug the appropriate connector of the keyboard cable into the socket on the underside of the
keyboard as shown in the illustration above.
12
Installing the tower server
"Technical
A26361-K632-Z100-1-7619

Advertisement

Table of Contents
loading

This manual is also suitable for:

Primergy 200

Table of Contents