Wiring: Pointek Cls200/300 Standard - Siemens Pointek CLS200 Operating Instructions Manual

Sitrans. capacitance switches
Hide thumbs Also See for Pointek CLS200:
Table of Contents

Advertisement

Wiring: Pointek CLS200/300 standard

WARNING: All field wiring must have insulation suitable for at least
250 V.
Notes:
Only qualified personnel are authorized to install and operate this equipment in
accordance with established safety practices and standards.
The Protective Earth Terminal indicated by
ground.
All wiring must be done by qualified personnel in accordance with all governing
regulations.
The equipment must be protected by a 15A fuse or circuit breaker in the building
installation.
A circuit breaker or switch in the building installation, marked as a disconnect
switch, shall be in close proximity to the equipment and within easy reach of the
operator.
Use shielded twisted pair cable, wire gauge 20 AWG to 14 AWG (0.5 mm
2
2.0 mm
).
Maximum working voltage between adjacent relay contacts is 250 V.
Relay contact terminals are for use with equipment which has no accessible live
parts and wiring which has insulation suitable for at least 250 V.
1.
Loosen the lid clip and remove the lid to access the connectors and electronics. (For
quick reference, the diagram on the next page can also be found on the underside of
the lid, together with a guide to switch function).
2.
Strip the cable jacket for approximately 70 mm (2.75") from the end of the cable, and
thread the wires through the gland.
3.
Connect the wires to the terminals (polarity is not important).
4.
Ground the instrument according to local regulations.
5.
Tighten the gland to form a good seal.
6.
If you wish to carry out a function test, follow the test procedures on page 23.
Page 20
Pointek CLS200/300 Standard – INSTRUCTION MANUAL
must be connected to reliable
7ML19985JH01
2
to

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Pointek cls300

Table of Contents