Drill Press Installation - Dake TB-16 Owner's Manual

Tb series; sb series; bench and floor drill press
Hide thumbs Also See for TB-16:
Table of Contents

Advertisement

1. UNCRATING AND INSTALLATION
INSTALLATION OF DRILL PRESS
MACHINE IS TOP HEAVY!
1. Location of the drill press should be in a well lit area with correct
power supply and that will not interfere with other machines or
operations.
2. Carefully uncrate machine from crate. Inspect all packing as not
to throw out any parts or manuals.
3. When transporting the machine please use caution. If using a
sling have someone steady the machine while transporting it.
4. Install your drill press on a sturdy level floor surface, or work
bench. (TB-16) The machine must be anchored to the floor or
workbench securely. Machine is top heavy.
5. Connect appropriate power to the machine. Make sure circuit
breakers are suitable for the machine. Consult local codes for
proper installation of machine. Always route power cables in a
safe manner away from traffic areas, damp areas, heat and
moving parts.
6. After installing the drill press, use the kerosene or degreasing
product to clean off the anti-rust oil which was applied at the
factory. Then wipe machined surfaces with a light coating of
lubricant oil. (Way oil)
7. Read rest of the owners manual before operating this machine.
Review and understand all safety instructions.
CAUTION
3

Advertisement

Table of Contents
loading

This manual is also suitable for:

Sb-16Sb-25Sb-32

Table of Contents