Set Up; Press Placement; Filling The Press Will Oil - Dake Force 50DA Instructional Manual

Single phase dura-press
Table of Contents

Advertisement

SET UP

PRESS PLACEMENT

• The press needs to be placed so that it has a safety perimeter of 2-1/2 feet on all sides
from any other objects or machines.
• Press should be placed on level floor with base angles touching the floor at all points.
Use shims where necessary.

FILLING THE PRESS WILL OIL

Fill the reservoir with DTE 24 Mobil hydraulic oil or equivalent.
a. 50DA holds 3 gallons of oil. Make sure the oil is new and be cautious no
contaminants get in while filling the reservoir.
b. Oil should be changed about once a year.
909250
9
Dake Corporation
724 Robbins Road
Grand Haven, MI 49417
www.dakecorp.com
REV052019

Advertisement

Table of Contents
loading

This manual is also suitable for:

909250

Table of Contents