Preparing The Truck For Operation With The Keypad; Switching Off The Truck With The Keypad - Jungheinrich EJE C20 Operating Instructions Manual

Industrial truck
Table of Contents

Advertisement

Preparing the truck for operation by entering a valid operator code
Procedure
The LED (75) lights up red.
When you have entered a valid operator code the LED (75) lights up green, the
travel program selected is indicated by the corresponding LEDs (71,72,73) and the
truck is switched on.
Z
Switching off the truck
Procedure
The truck is switched off and the LED (75) is lit red.
Z

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents