Performing Power-On and Power-Off Commissioning
4b
Power-on process
Onsite
environment
Power-off process
For details, see Starting
and Stopping the UPS
in Appendix B. P49
The hardware installation of the MicroDC3000H suite is
complete. For subsequent operations, see
47
For details, see Starting
and Stopping the UPS
in Appendix B. P49
Loads refer to
power consuming
devices, such as
switches and
routers.
Onsite
environment
Appendix.