Installation; Receiving The Product; Dimensions And Weight; Handling - Sime MURELLE REVOLUTION 25 User, Installation And Servicing Instructions

Wall-mounted hybrid condensing boiler
Hide thumbs Also See for MURELLE REVOLUTION 25:
Table of Contents

Advertisement

5

INSTALLATION

m
CAUTION
The appliance must only be installed by the Sime
Technical Service or by qualified professionals who
suitable protective safety equipment.
MUST wear
5.1

Receiving the product

is delivered in a single unit protected by
Murelle Revolution 25
cardboard packaging.
The plastic bag found inside the packaging contains the
following:
– Installation, use and maintenance manual
– Certificate of warranty
– Hydrostatic test certificate
– System booklet
– External sensor
– Main control panel (remote)
– Bag with expansion plugs
– Boiler and heat pump energy labels
– Anti-vibration and spacer panels
– Paper template for boiler installation.
d
IT IS FORBIDDEN
Do not leave packaging material around or near
children since it could be dangerous. Dispose of it as
prescribed by legislation in force.
5.2

Dimensions and weight

Description
W (mm)
D (mm)
H (mm)
H1 (mm)
H2 (mm)
Weight (kg)
30
Fig. 48
Murelle Revolution 25
600
391
900
82,5
71
103
H1
H2
H
L
5.3

Handling

During transportation, the boiler must be kept in a vertical
position, and knocks against walls or hard surfaces should be
avoided.
d
IT IS FORBIDDEN
Position the appliance horizontally or on its side.
YES
NO
P
Fig. 49
NO
Fig. 50

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the MURELLE REVOLUTION 25 and is the answer not in the manual?

Questions and answers

Table of Contents