Cornelius SPIRE 4.1 Operator's Manual page 18

Hide thumbs Also See for SPIRE 4.1:
Table of Contents

Advertisement

Spire 4.1 Operator's Manual
4. With the 2-piece agitator removed from the
bin, clean the interior of the bin, the top
cover and the agitator assembly.
Note: Use a soap solution with a nylon bris-
tle brush, sponge or cloth to clean the inte-
rior of the bin, top cover and agitator
assembly.
Then, thoroughly rinse the bin, cover and
agitator surfaces with clean potable water.
5. Place the bottom agitator over the spindle
as shown Figure 26.
6. Then, place the top agitator in place over
the bottom agitator making sure the two agi-
tator components are seated properly as
shown in Figure 27.
7. With the 2-piece agitator assembly seated
properly, place the agitator cover over the
2-piece agitator assembly and secure it
with the agitator retaining screw.
Make sure the agitator retaining screw is
tight as shown in Figure 28.
Publication Number: 620066826OPR
Spindle
Figure 25
Bottom
Agitator
over the
Spindle
Figure 26
Top and
Bottom
Agitator
Assembly
Figure 27
Agitator
Retaining
Screw
Agitator
Cover
Figure 28
- 18 -
© 2017, Cornelius Inc.

Advertisement

Table of Contents
loading

Table of Contents