Download Print this page

Fisher Chevrolet 13000 series Service Manual page 241

1967 body manual

Advertisement

WINDSHIELD PILLAR AREA
CEMENT ONLY
EXTRA BEAD OF CEMENT
RIMMED EDGES
OF FABRIC
COVER
VIEW A
TRIMMED EDGE OF FABRIC COVER
MEDIUM BODIED SEALER
AT ALL DRIVE NAILS
VIEW B
FLEXIBLE RETAINER
DRIP MOLDING
TRIMMED EDGE OF
FABRIC COVER
VIEW C
TYPICAL DRIVE NAIL
LOCATIONS (MEDIUM
BODIED SEALER AT
EACH DRIVE N A I L )
r
VIEW D
FABRIC COVER BELOW
BACK WINDOW
(VIEW D)
FABRIC COVER ENDS AT
BACK WINDOW
LOWER EDGE
MEDIUM BODIED
SEALER AT ALL
DRIVE NAILS
RIMMED EDGE OF
FABRIC COVER
VIEW E
STEP * 5
CEMENT INTO
DRIP MOLDING
STEP # 4
CEMENT AT ROOF
EXTENSION AREA
STEP # 1
CEMENT TO 1/2 OF ROOF PANEL UP TO
BUT NOT IN DRIP MOLDING
STEP # 2
CEMENT RIGHT SIDE
SIMILAR TO LEFT SIDE
STEP # 3
CEMENT BELOW BACK W I N D O W
AS REQUIRED
2435
VIEW F
CEMENTING PROCEDURE
Fig. 12-4 —Fabric Roof Cover Installation - Styles without Roof Panel Molding

Advertisement

loading