First start of control - continued
Start the control
1. Go to Start/Stop display
Press the blue manual control button at the bottom of the
display.
2. Start control
AK-CC 750 - 080Z0130 & 080Z0139
Press in the field against Main switch.
Select ON.
Press OK.
The controller will now start the controlling when the external
function switch is also activated to ON.
If you wish to start an extra defrost cycle, it can be done
via this display and also from the defrost screen.
RS8GM222 © Danfoss 10-2014
65
Need help?
Do you have a question about the AK-CC 750 series and is the answer not in the manual?
Questions and answers