Appendix A: Initial Site Survey Checklist - 3D Systems ProX 800 Original Instructions Manual

3d stereolithography production printer
Hide thumbs Also See for ProX 800:
Table of Contents

Advertisement

APPENDIX A: INITIAL SITE SURVEY CHECKLIST

8 
Survey the areas where you have considered placing your new SLA system . Consider the following factors before you decide on
your ProX 800 facility .
Option 1
Option 2
Option 3
Option
1
2
3
Is there enough space for all equipment in that area, or will you separate the SLA system from the
  
secondary finishing equipment? (Refer to the section,
  
Is the flooring a solid, nonporous surface suitable for cleaning with isopropyl alcohol? (Refer to the
section,
Can the location be isolated, as a laser safety precaution? Can closing and locking the door during
  
installation or a service call prevent access to the location by unauthorized personnel? (Refer to the note
in the section,
Can the required equipment and accessories be located either in the same room or in an adjoining
  
room to the ProX 800? (Refer to the section,
  
Is the air conditioning adequate for that area? (Refer to the section,
  
Can humidity be maintained at an appropriate non-condensing level for the SLA material (20-50%)?
(Refer to the section,
Is adequate electrical power available to the site? Are there at least two 220 V circuits; two outlets, each
  
with its own circuit and at least one additional 110/220 V outlet for servicing the system? (Refer to the
sections,
Is there minimal UV-intensive lighting or natural sunlight? (Refer to the section,
  
7)
  
Is 10/100/1000 BASE-T Ethernet network and cabling installed to the location? (Refer to the section,
"Network Access" on page
Is the room clean? Is construction of floors, ceilings, and walls complete? (Refer to the section,
  
Cleanliness" on page
Is an appropriate forklift available during the installation appointment to move the system and its
  
accessories to their designated location? (Refer to the section,
Lifting Equipment" on page
Are the hallways and doorways adequate to allow passage of a forklift carrying a crated or uncrated SLA
  
system? (Refer to the section,
  
  
  
  
  
Is there a compressed air connection with pressure controller and fast-closing connection? (Optional)
3D Systems, Inc.
"Floor Area/Surface" on page
"Space Requirements" on page
"Humidity" on page
"Electrical Requirements" on page 5
7)
7)
14)
"Minimum Passageway and Door Openings" on page
ProCure UV Chamber?
Bench for cleaning parts?
Green part rinsing and finishing area?
Sink and eyewash station?
"Optimal Site Layout" on page
3)
3)
"Optimal Site Layout" on page
5)
"ProCure Electrical Requirements" on page
and
"Availability for Adequate Forklift or
16
3)
3)
"Temperature" on page
5)
8)
"Lighting" on page
"Air
14)