APPENDIX A: INITIAL SITE SURVEY CHECKLIST

8 
Survey the areas where you have considered placing your new SLA system. Consider the following factors before you decide on
your ProX 950 facility.
Option 1
Option 2
Option 3
Option
1
2
3
Is there enough space for all equipment in that area, or will you separate the SLA system from the sec-
  
ondary finishing equipment?
  
Is the flooring a solid, nonporous surface suitable for cleaning with isopropyl alcohol?
Can the location be isolated, as a laser safety precaution? Can closing and locking the door during in-
  
stallation or a service call prevent access to the location by unauthorized personnel?
Can the required equipment and accessories be located either in the same room or in an adjoining
  
room to the ProX 950 ?
  
Is the air conditioning adequate for that area?
Can humidity be maintained at an appropriate non-condensing level for the SLA material (20-50%)?
  
page
Is adequate electrical power available to the site? Are there at least two 220 V circuits; two outlets, each
  
with its own circuit and at least one additional 110/220 V outlet for servicing the system?
and 9)
  
Is there minimal UV-intensive lighting or natural sunlight?
  
Is 10/100/1000 BASE-T Ethernet network and cabling installed to the location?
  
Is the room clean? Is construction of floors, ceilings, and walls complete?
Does the location offer network access to connect an optional Web cam for remote viewing?
  
8)
Is an appropriate forklift available during the installation appointment to move the system and its ac-
  
cessories to their designated location?
Are the hallways and doorways adequate to allow passage of a forklift carrying a crated or un-crated
  
SLA system?
  
  
  
  
  
Is there a compressed air connection with pressure controller and fast closing connection? (Optional)
3D Systems, Inc.
(See page
(See page
6)
(See page
11)
• ProCure UV Chamber?
• Bench for cleaning parts?
• Green part rinsing and finishing area?
• Sink and eyewash station?
3)
3)
(See page
6)
(See page
(See page
11)
15
(See page
(See page
(See pages 6
8)
(See page
8)
(See page
8)
(See page
3)
3)
(See

Advertisement

Table of Contents
loading

Table of Contents