After the UPS system is unpacked and moved to the final installation location, the
UPS and Environmental Cabinets are ready to be joined. Once the cabinets are
joined, internal and external wiring is installed. Figure 4 shows the UPS and
Environmental cabinets assembled. The top view shows the cable entry plate in
the Environmental cabinet.
TOP VIEW
FRONT VIEW
Powerware BPIII Harsh Environment UPS 50--75 kVA Installation and Operatio
164201261 Rev. F 111503
Installing the Harsh Environment
Figure 4. UPS and Environmental Cabinets