Lenovo ThinkSystem SR860 Setup Manual page 90

Hide thumbs Also See for ThinkSystem SR860:
Table of Contents

Advertisement

Figure 66. Processor and memory expansion tray air baffle installation
Attention: Air baffle is required for airflow that creates proper cooling. Make sure proper air baffle
(s) for system configuration is installed before the power is turned on.
Step 3.
Slightly slide power supply 2 out from the power supply bay (see "Remove a hot-swap power
supply unit" in ThinkSystem SR860 Maintenance Manual).
Step 4.
Grip on the blue touch point on the handle of the expansion tray, and lift it up; then, lower the tray
vertically into the server with nailheads aligned to the slots on both sides.
Step 5.
Rotate the handle down to make sure the expansion tray is fully seated into the system board.
82
ThinkSystem SR860 Setup Guide

Advertisement

Table of Contents
loading

This manual is also suitable for:

7x697x70

Table of Contents