5-i nch High Speed Dome User Ma nual
3.6.2 Configuring Line Synchronization
Purpose:
This speed dome supports user-defined line (external) synchronization of the signal.
Steps:
1. Enter PTZ configuration menu:
MAIN MENU > DOME SETTINGS > LINE SINC
2. Set the synchronization mode.
ON: Enable the line synchronization. Adjust the phase of the line synchronization to synchronize
input power, with the line synchronization phase (V-phase) configurable from 0 to 255 degrees.
OFF: Set the line synchronization off.
Note:
External synchronization is not supported.
3.6.3 Restoring Default Dome Settings
Purpose:
You can reset all dome settings to factory default parameters as shown in the table below.
Note:
Dome settings are mainly of PTZ parameters and alarm parameters, and also include some
system settings, e.g. dome address.
Enter default dome settings menu:
MAIN MENU > RESTORE DEFAUTLS
Click IRIS+ to restore the dome settings to the default value as shown in below table; or click IRIS- to
exit.
© Hikvision Digital Technology C o., Ltd. All Rights Reserved.
LINE SYNC
LINE LOCK
V-PHASE
BACK
Synchronization Configuration
Figure 3-28
Default Dome Settings
Table 3-3
Parameters
Dome address
Baud rate
120Ω matching
resistance
Soft address
ON
0
EXIT
Default Value
0
2400bps
Off
Off
31