5-6. Installing Accessory Cables Into Cable Sleeve
Pro Heat Side
2
Notes
1
6
1
Cable Sleeve
2
TC Extension Cable
3
Travel Sensor Cable
4
Pneumatic Tubing Assembly
5
IR Extension Cable
6
Alignment Tabs
Lay the TC extension cable and sleeve
assembly out flat.
Unzip the cable sleeve. Position items in
the cable sleeve at the approximate di-
mensions shown on the Rolling Inductor
side of the drawing. Make sure items are
oriented as shown in the drawing.
To help aid in correct orientation of the IR
extension cable in the cable sleeve, note
location of alignment tabs on IR exten-
sion cable connectors.
Rolling Inductor Side
18 in.
(457 mm)
15 in.
(381 mm)
6 in.
(152 mm)
Protective Sleeving
3
4
5
6
Ref. 265 156-C
OM-261823 Page 13